Things are moving along, albeit slowly, in the bathroom. The flooring has been fixed down, the wallpaper is up and the panelling is in place. Originally I had planned for the panelling to be a bit higher than you see here, but after placing some of the items, it just didn't look right so I lowered it by an inch.
Original set up -
Now -
The lights have also been added. These are lovely little handmade lights by Art of Mini and I'll disguise the wires with gold paint. That's the beauty of close ups - they emphasise the tiny details that can be missed.
I've been playing with furniture placement and this is how it looks at the moment. The cistern has been heightened as it was just a low fitting and it still needs its pull chain and some brackets. A covered table will sit front left but I needed a feel for the space.
Still lots to do!
















